Description
Application Process
Step 1: Safety First
Ventilation: Always apply the paint in a well-ventilated location.
Protection: Wear a NIOSH-approved respirator to protect against paint fumes.
Step 2: Prepare Your Environment
Ideal Conditions: Ensure the spraying environment is between 75°F and 80°F with very low
humidity for optimal results.
Step 3: Apply Base Coat
Follow Instructions: Apply your base coat color as directed by the manufacturer of the specific
base coat you are using.
Step 4: Drying Time for Base Coat
Wait Time: Allow at least 30 minutes after the last base coat application for it to dry completely
before applying Soft Touch.
Step 5: Mix Soft Touch
Ratio: Combine your Soft Touch material with the provided hardener and thinner in a 4:1:1 ratio
(4 parts resin, 1 part hardener, 1 part thinner).
Step 6: Apply Soft Touch
Coating: Apply 2-3 wet coats of Soft Touch paint.
Flash Time: Wait 10 to 15 minutes between each coat.
Pressure & Tip Size: Use around 25 PSI and a tip size between 1.3 and 1.7 for the best results.
Step 7: Drying Process
Forced Drying: To speed up drying, bake the coated part for about 1 hour at 140°F.
Final Air Dry: Allow the item to air dry for a full 24 hours.
Touch Dry: The material should be dry enough to touch in about 2-3 hours after application.
Step 8: Final Thickness. Remember; Soft touch should not be re-coat. It is one time application.
Film Thickness: Expect a thickness of approximately 1.3 to 1.5 mils per full wet coat.
Need Help?
If you have any questions or need assistance at any point in this process, don’t hesitate to reach
out! Our technical support team is here to help you every step of the way.






Reviews
There are no reviews yet.